雨停超强墙地固界面剂采用改性聚合物纳米乳液,具有很强的渗透能力,能渗透到墙体的微小空隙对基层进行深层加固,提高腻子与基材之间的结合力;并能有效阻断从基材毛细孔渗出的盐和碱,确保墙面涂层的牢固结合。
Superstrong wall ground interfacial agent of YUTING that adopts modified polymer and it has the super strong penetrating power that can permeate minute openings of the wall. Therefore, it reinforces the base course, improves the binding force between the putty and the base material; what's more, it can block off the salt and alkali effectively which seeping through the pores of the base material to make sure that the firm combination of the wall and coating, and tiling subsequent won't fall off.
适用范围/Application Scope
有疏松或起粉现象的腻子墙面和水泥基面的界面加固
Interface reinforce of white powder wall and cement surface which has loose or power won't take off; Brush the back of tile before pasting.
使用方法/APPLICATION METHOD
基面清理:确保墙面清洁干燥和平整,确保预涂基材表面湿度小于10%。清除表面灰尘、油腻和松散泥灰,如果有空隙及时修补;涂刷雨停墙地固界面剂:涂刷墙地固界面剂一遍,注意涂刷完全,避免漏涂;针对多孔、干燥且吸收率高的基材,建议在第一遍干燥后再涂刷一遍,应确保界面处理剂干燥后手摸不脱落,方视为涂刷合格;
批刮腻子:待墙地固界面剂充分干燥后,选择内墙腻子系列产品进行找平批嵌处理;
涂刷涂料:按照内墙涂料配套要求进行施工
The surface cleaning: make sure the wall is clean ,dry ,flat, and the surface humidity of the substrate is less than 10%. clean surface dust, greasy and loose plaster, repair it with the coating if there has any gaps ;Brush with Superstrong wall ground interfacial agent of YUTING: brushing completely with super-strong wall ground interfacial agent once and shall be free from holiday. It is recommended brush the surface again when the surface is dry after brush at the first time if the base material is porous, dry and high absorption rate. Of course, it must be sure that won't come off after drying. Then it can be deemed qualified. Batch putty: After the wall solid interface agent to be fully dry, then choose series of interior wall putty products to smooth with a scraper. Brush coating: construction of interior wall coating as required.
施工方法和用量/Construction method and dosage
建议施工方法:辊涂/刷涂
理论涂刷面积:疏松基材:4-6m²/kg/遍 普通基材:5-8m²/kg/遍
干燥时间:2小时(25℃,湿度50%情况下);
因施工表面的疏松程度有所不同,实际耗量与理论耗量可能会有所变化
Recommended: roller coating or brush
General brushing area: loose material: 4-6m²/kg/ a time smooth material: 5-8m²/kg/ a time
Drying time: 2 hours (25℃, air humidity 50%)
The consumption will change with the actual situation.
贮存条件/Storage condition
存放在阴凉、通风、干燥的仓库内,防止日光直射,贮存环境温度应保持在5-35℃之间。
Stored in a cool, ventilated, dry warehouse, avoid direct sunlight, the temperature of storage environment should be between 5℃ and 35℃.
注意事项/Attention
施工时应保持空气流通,应远离阳光直射及热源;
如沾染眼睛,立即用大量清水清洗,并到医院治疗;
放置在儿童取不到的地方。
Please keep the good air circulation, and keep away from the direct sunlight and heat source;
Wash with plenty of water immediately if contamination of eyes! Then go to a doctor;
Put it in the place where children can't get.
产品包装/Product packaging
15kg/桶
15kg/ barrel